The International Fusion Materials Irradiation Facility (IFMIF) linear IFMIF prototype accelerator injector dedicated to high intensity deuteron beam production has been designed, built, and tested at CEA/Saclay between 2008 and 2012. After the completion of the acceptance tests at Saclay, the injector has been fully sent to Japan. The re-assembly of the injector has been performed between March and May 2014. Then after the check-out phase, the production of the first proton beam occurred in November 2014. Hydrogen and deuteron beam commissioning is now in progress after having proceeded with the final tests on the entire injector equipment including high power diagnostics. This article reports the different phases of the injector installation pointing out the safety and security needs, as well as the first beam production results in Japan and chopper tests. Detailed operation and commissioning results (with H(+) and D(+) 100 keV beams) are reported in a second article.

Download full-text PDF

Source
http://dx.doi.org/10.1063/1.4932977DOI Listing

Publication Analysis

Top Keywords

international fusion
8
fusion materials
8
materials irradiation
8
irradiation facility
8
deuteron beam
8
beam production
8
injector
6
installation operation
4
operation international
4
facility injector
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!