Severity: Warning
Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 176
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML
File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
Aims: To investigate the impact of the UKPDS risk engine on management of CHD risk in T2DM patients.
Methods: Observational study among 139 GPs. Data from 933 consecutive patients treated with a maximum of two oral glucose lowering drugs, collected at baseline and after twelve months. GPs estimated the CHD risk themselves and afterwards they calculated this with the UKPDS risk engine. Under- and overestimation were defined as a difference >5 percentage points difference between both calculations. The impact of the UKPDS risk engine was assessed by measuring differences in medication adjustments between the over-, under- and accurately estimated group.
Results: In 42.0% the GP accurately estimated the CHD risk, in 32.4% the risk was underestimated and in 25.6% overestimated. Mean difference between the estimated (18.7%) and calculated (19.1%) 10 years CHD risk was -0.36% (95% CI -1.24 to 0.52). Male gender, current smoking and total cholesterol level were associated with underestimation. Patients with an subjectively underestimated CHD risk received significantly more medication adjustments. Their UKPDS 10 year CHD risk did not increase during the follow-up period, contrary to the other two groups of patients.
Conclusions: The UKPDS risk engine may be of added value for risk management in T2DM.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1016/j.pcd.2015.04.006 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!