A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Using the "final-on-four" concept to deliver an immediate metal-resin implant-fixed complete dental prosthesis. | LitMetric

Using the "final-on-four" concept to deliver an immediate metal-resin implant-fixed complete dental prosthesis.

J Prosthet Dent

Professor, The Ohio State University, College of Dentistry, Division of Restorative and Prosthetic Dentistry, Columbus, Ohio.

Published: August 2015

In traditional dental implant therapy, the time between implant placement and delivery of the definitive prosthesis can be long and uncomfortable for a patient wearing a conventional removable denture on an atrophied ridge. New clinical protocols, often with tilted implants, are being used to immediately restore mandibular implants with interim restorations, thus shortening the patient's return to function. However, these conversion type interim restorations do not decrease the time to definitive prosthetic rehabilitation. The Ohio State University (OSU) developed an immediate load surgical and prosthetic protocol to compensate for the disadvantages of previous techniques. With this protocol, a custom, definitive, screw-retained metal-resin fixed prosthesis can be delivered 2 to 4 days postoperatively and has been described using 5 implants. This clinical report presents the OSU immediate loading protocol, combined with a tilted implant technique, for the fabrication of a mandibular metal-resin implant fixed complete dental prosthesis (MRIFCDP) in 3 days postoperatively and with only 4 implants. Replacing the mandibular dentition with an immediate load-fixed metal-resin prosthesis by means of the "final-on-four" technique resulted in a custom, definitive, and functional restorative solution immediately after surgery.

Download full-text PDF

Source
http://dx.doi.org/10.1016/j.prosdent.2014.11.016DOI Listing

Publication Analysis

Top Keywords

complete dental
8
dental prosthesis
8
interim restorations
8
custom definitive
8
days postoperatively
8
prosthesis
5
"final-on-four" concept
4
concept deliver
4
metal-resin
4
deliver metal-resin
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!