The hybrid granular sludge (HGS) formation and its performances on phosphorus removal were investigated in a sequencing batch airlift reactor. Under conditions of low superficial air velocity (SAV = 0.68 cm s(-1)) and relatively long settling time (15-30 min), aerobic granules appeared and coexisted with bio-flocs after 120 days operation. At the stable phase, 54% of total suspended solid (m/m) was granular sludge with the two typical sizes (D(mean) = 1.77 ± 0.33 and 0.89 ± 0.11 mm) in the reactor, where the settling velocity was 98.7 ± 12.4 and 37.8 ± 0.9 m h(-1) for the big and small granules. With progressive extension of anaerobic time from 15 to 60 min before aerobic condition per cycle during the whole experiment, the HGS system can be maintained at a high total phosphorus removal efficiency (ca. 99%) since Day-270. The phosphorus content (wt %) in biomass was respectively 9.54 ± 0.29, 7.60 ± 0.48 and 6.15 ± 0.59 for the big granules, small granules and flocs.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1080/09593330.2015.1045943 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!