A comparison of direct and two-stage transportation of patients to hospital in Poland.

Int J Environ Res Public Health

Department of Public Health, Faculty of Health Sciences, Nicolaus Copernicus University in Toruń, Bydgoszcz 85-830, Poland.

Published: April 2015

Background: The rapid international expansion of telemedicine reflects the growth of technological innovations. This technological advancement is transforming the way in which patients can receive health care.

Materials And Methods: The study was conducted in Poland, at the Department of Cardiology of the Regional Hospital of Louis Rydygier in Torun. The researchers analyzed the delay in the treatment of patients with acute coronary syndrome. The study was conducted as a survey and examined 67 consecutively admitted patients treated invasively in a two-stage transport system. Data were analyzed statistically.

Results: Two-stage transportation does not meet the timeframe guidelines for the treatment of patients with acute myocardial infarction. Intervals for the analyzed group of patients were statistically significant (p < 0.0001).

Conclusions: Direct transportation of the patient to a reference center with interventional cardiology laboratory has a significant impact on reducing in-hospital delay in case of patients with acute coronary syndrome.

Perspectives: This article presents the results of two-stage transportation of the patient with acute coronary syndrome. This measure could help clinicians who seek to assess time needed for intervention. It also shows how time from the beginning of pain in chest is important and may contribute to patient disability, death or well-being.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC4454926PMC
http://dx.doi.org/10.3390/ijerph120504572DOI Listing

Publication Analysis

Top Keywords

two-stage transportation
12
patients acute
12
acute coronary
12
study conducted
8
treatment patients
8
coronary syndrome
8
transportation patient
8
patients
7
comparison direct
4
two-stage
4

Similar Publications

Automated large-scale farmland preparation operations face significant challenges related to path planning efficiency and uniformity in resource allocation. To improve agricultural production efficiency and reduce operational costs, an enhanced method for planning land preparation paths is proposed. In the initial stage, unmanned aerial vehicles (UAVs) are employed to collect data from the field, which is then used to construct accurate farm models.

View Article and Find Full Text PDF

Daily activities and suspected dementia among community-dwelling older adults: a cross-sectional study.

BMC Geriatr

December 2024

School of Nursing and Rehabilitation, Nantong University, No.19 Qixiu Road, Nantong City, Jiangsu Province, China.

Background: Dementia is undiagnosed among many older adults, and more than half the people in local communities live with symptoms of dementia are not properly treated.

Objective: The study aims to explore the relationship between decline of daily activities and the incidence of suspected dementia.

Methods: A two-stage sampling method was used to conduct a multicenter cross-sectional survey.

View Article and Find Full Text PDF

Carbon-glass hybrid fiber-reinforced epoxy polymer (C-GFRP) winding pipes integrated with the advantages of light weight, high strength, corrosion resistance, and cost-effectiveness offer immense potential to mitigate corrosion issues in oil, gas, and water transportation pipelines. In this study, C-GFRP winding pipes underwent accelerated aging tests through immersion in distilled water at temperatures of 25 °C, 40 °C, and 60 °C for 146 days. Water absorption tests were conducted to investigate the water absorption behavior of only CFRP- or GFRP-side absorbed water.

View Article and Find Full Text PDF

Purchasing or leasing? Equipment upgrades for a capital-constrained manufacturer.

J Environ Manage

December 2024

School of Management, University of Science and Technology of China, 96 Jinzhai Road, Hefei, Anhui, 230026, PR China. Electronic address:

Purchasing and leasing are two main methods to implement equipment upgrades, which can reduce production costs and facilitate manufacturing transformation. In practice, small and medium-sized manufacturers have insufficient cash to balance equipment upgrades and daily production. Under a two-stage setting, this study examines a pull supply chain consisting of a capital-constrained manufacturer and a retailer, where the manufacturer can borrow bank loans.

View Article and Find Full Text PDF

Background: The World Health Organisation (WHO) estimates that about 3.2 billion people which is nearly half of the world's population are at risk of malaria. Annually about 216 million cases and 445,000 deaths of malaria occur globally.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!