Basing on the materials of many years observation, literature and their own data, the authors consider expert prognostication methodology in regard to opisthorchiasis in hydro construction regions as exemplified by the Shidertinsk focus and Irtysh-Karaganda canal. Analysis of prognostication signs and alterations connected with them showed that relatively satisfactory situation concerning opisthorchiasis for 10-year period of channel exploitation was provided by measures aiming at water bodies protection, by changes in ichthyofauna, and by breaking the connection of water voles with fish. Further prognosis puts you on guard because of releasing a strict sanitary regime in coastal region due to opening the channel for population and fishery development.

Download full-text PDF

Source

Publication Analysis

Top Keywords

[the prognosis
4
prognosis opisthorchiasis
4
opisthorchiasis situation
4
situation area
4
area influenced
4
influenced hydraulic
4
hydraulic engineering
4
engineering works]
4
works] basing
4
basing materials
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!