A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Evaluation of an advance surgical scheduling system. | LitMetric

Evaluation of an advance surgical scheduling system.

J Med Syst

Department of Health Services Management, School of Public Health, University of Michigan, Ann Arbor 48109.

Published: February 1989

Utilization of the surgical suite is of significant concern to administrators because of the high costs associated with this facility. Scheduling systems, which control the flow of patients into the surgical arena, are frequently cited as a primary means of improving resource utilization. The objective of the research reported herein was to test the hypothesis that the implementation of a centralized advance surgical scheduling system is associated with a significant improvement in operating room (OR) team utilization rate. Data were collected at a test hospital and at a control hospital for three months prior to implementation of a scheduling system at the test hospital, and for an additional three months starting nine months after implementation. The mean OR team utilization rate at the test hospital rose 12% from 0.68 prior to implementation to 0.77 postimplementation. The mean OR team utilization rate at the control hospital fell 8%, from 0.78 preimplementation to 0.73 postimplementation. The research hypothesis was supported using multiple regression, which controlled for various intervening variables that could affect utilization rate independently of the scheduling system. A literature review showed that experimental designs such as the one used in this study have not previously been used to evaluate scheduling systems in hospital settings, despite the increasing need to justify the purchase and implementation of such systems.

Download full-text PDF

Source
http://dx.doi.org/10.1007/BF01002386DOI Listing

Publication Analysis

Top Keywords

scheduling system
16
utilization rate
16
team utilization
12
test hospital
12
advance surgical
8
surgical scheduling
8
scheduling systems
8
control hospital
8
three months
8
prior implementation
8

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!