Lung cancer development is associated with extensive pulmonary inflammation. In addition, the linkage between chronic obstructive pulmonary disease (COPD) and lung cancer has been demonstrated in population-based studies. IL-17-producing CD4 helper T cells (Th17 cells) play a critical role in promoting chronic tissue inflammation. Although Th17 cells are found in human COPD and lung cancer, their role is not understood. We have thus used a mouse model of lung cancer, in which an oncogenic form of K-ras (K-ras(G12D)), frequently found in human lung cancer, is restrictedly expressed in lung epithelial cells [via Clara cell secretory protein (CCSP(cre))]. In this model, Th17 and Treg but not Th1 cells were found enriched at the tumor tissues. When CCSP(cre)/K-ras(G12D) mice were weekly challenged with a lysate of nontypeable Haemophilus influenza (NTHi), which induces COPD-type inflammation and accelerates the tumor growth, they showed greatly enhanced Th17 cell infiltration in the lung tissues. Lack of IL-17, but not IL-17F, resulted in a significant reduction in lung tumor numbers in CCSP(cre)/K-ras(G12D) mice and also those treated with NTHi. Absence of IL-17 not only resulted in reduction of tumor cell proliferation and angiogenesis, but also decreased the expression of proinflammatory mediators and reduced recruitment of myeloid cells. Depletion of Gr-1(+)CD11b(+) myeloid cells in CCSP(cre)/K-ras(G12D) mice suppressed tumor growth in lung, indicating Gr-1(+)CD11b(+) myeloid cells recruited by IL-17 play a protumor role. Taken together, our data demonstrate a critical role for Th17 cell-mediated inflammation in lung tumorigenesis and suggest a novel way for prevention and treatment of this disease.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC3992670 | PMC |
http://dx.doi.org/10.1073/pnas.1319051111 | DOI Listing |
Cardiooncology
January 2025
Division of Cardiovascular Medicine, Gill Heart Institute, University of Kentucky, Lexington, KY, USA.
Background: Heart failure (HF) is associated with systemic inflammation and hypercatabolic syndrome, impacting body metabolism. The advanced lung cancer inflammation index (ALI) is a novel inflammatory and nutritional biomarker. We aimed to investigate the prognostic role of ALI in patients with HF.
View Article and Find Full Text PDFCell Commun Signal
January 2025
Institute of Cancer Stem Cell, Dalian Medical University, Dalian, Liaoning Province, China.
Background: Intracellular membraneless organelles formed by liquid-liquid phase separation (LLPS) function in diverse physiological processes and have been linked to tumor-promoting properties. The nucleolus is one of the largest membraneless organelle formed through LLPS. Deubiquitylating enzymes (DUBs) emerge as novel therapeutic targets against human cancers.
View Article and Find Full Text PDFBMC Cancer
January 2025
Guangdong Provincial Key Laboratory of Tumor Interventional Diagnosis and Treatment, Zhuhai Institute of Translational Medicine, Zhuhai People's Hospital Affiliated with Jinan University, Jinan University, Zhuhai, China.
Background: Multiple studies have demonstrated that the abundance and functionality of γδ T cells are favorable prognostic indicators for prolonged survival in cancer patients. However, the association between the immunophenotype of circulating γδ T cells and the therapeutic response in NSCLC patients undergoing chemotherapy or targeted therapy remains unclear.
Methods: Patients with EGFR wild-type (EGFR-WT) or mutant (EGFR-Mut) non-small cell lung cancer (NSCLC), diagnosed between January 2020 and January 2024, were included in this study.
BMC Pulm Med
January 2025
Department of Oncology, Guang'anmen Hospital, China Academy of Chinese Medical Sciences, Beijing, 100053, China.
Introduction: Although there are a number of neoadjuvant immunotherapy combinations that can be applied to the treatment of perioperative non-small cell lung cancer patients, the optimal treatment combination strategy has not yet been determined.
Methods: We searched PubMed, EMBASE, Cochrane Library, ClinicalTrials.go and randomised controlled trials (RCTs) from major international conferences for literature related to neoadjuvant immunotherapy combinations published as first-line treatment options for non-small cell lung cancer from the start of the library to 20 February 2024, and performed a systematic review and network meta-analysis.
BMC Complement Med Ther
January 2025
Department of Biotechnology, Era's Lucknow Medical College and Hospital, Era University, Lucknow, India.
The spreading of COVID-19 has posed a risk to global health, especially for lung cancer patients. An investigation is needed to overcome the challenges of COVID-19 pathophysiology and lung cancer disease. This study was designed to evaluate the phytoconstituents in Punica granatum peel (PGP), its anti-lung cancer activity, and in silico evaluation for antiviral potential.
View Article and Find Full Text PDFEnter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!