Background: Substantial time elapses before patients with hilar cholangiocarcinoma (HCC) receive surgical treatment because of time-consuming preoperative staging and other interventions, including biliary drainage and portal vein embolization. Prolonged times potentially lead to unresectability and the formation of metastases, yet these issues have not been investigated previously in HCC. This study aimed to evaluate the time between onset of symptoms and the provision of ultimate treatment in patients with HCC and the impact of the length of time on outcomes.
Methods: Delays in the treatment of consecutive patients with HCC were evaluated by contacting general practitioners (GPs) and extracting data from hospital files. Time periods were correlated with resectability, occurrence of metastasis, tumour stage and survival using logistic and Cox regression analyses.
Results: Treatment times in 209 consecutive HCC patients were evaluated. The median time from first GP visit until presentation at the tertiary centre was 35 days. Time until treatment was longer when initial symptoms did not include jaundice (non-specific symptoms, P < 0.001). Duration of workup and preoperative biliary drainage at the tertiary centre prior to final surgical treatment resulted in an additional median time of 74 days. No correlation was found between treatment time in weeks and resectability [odds ratio (OR) 1.010, 95% confidence interval (CI) 0.985-1.036], metastasis (OR = 0.947, 95% CI 0.897-1.000), tumour stage (OR = 1.006, 95% CI 0.981-1.031) or survival in resected patients (hazard ratio = 0.996, 95% CI 0.975-1.018).
Conclusions: The time that elapses between the presentation of symptoms and final treatment in patients with HCC is substantial, especially in patients with non-specific symptoms. This time, however, does not affect resectability, metastasis, tumour stage or survival, which suggests that preoperative optimization should not be omitted because of potential delays in treatment.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC4008165 | PMC |
http://dx.doi.org/10.1111/hpb.12156 | DOI Listing |
Minerva Pediatr (Torino)
January 2025
Transalpine Center of Pediatric Sports Medicine and Surgery, University of Milano-Bicocca, Monza, Monza-Brianza, Italy.
Introduction: The aim of this study was to evaluate the difference between symptomatic discoid lateral meniscus (DLM) and healthy knees in terms of gait analysis.
Evidence Acquisition: A systematic review was conducted from the electronic databases PubMed/MEDLINE, EMBASE and Scopus. The review was performed on studies that reported data on kinematics, gait analysis, biomechanics in discoid lateral meniscus, before and after surgery.
JAMA Netw Open
January 2025
Department of Gastroenterology, Qilu Hospital of Shandong University, Jinan, Shandong, China.
Importance: High-quality colonoscopy reduces the risks of colorectal cancer by increasing the adenoma detection rate. Routine use of an automatic quality control system (AQCS) to assist in colorectal adenoma detection should be considered.
Objective: To evaluate the effect of an AQCS on the adenoma detection rate among colonoscopists who were moderate- and low-level detectors during routine colonoscopy.
Neurol Sci
January 2025
Department of Geriatrics and Neurology, Diakonie Hospital Jung Stilling, Siegen, Germany.
Background: Surgical clipping and endovascular coiling are both effective in preventing aneurysmal subarachnoid hemorrhage, but the choice between these interventions remains controversial, leading to treatment disparities across medical centers.
Methods: A systematic review and meta-analysis were conducted, including relevant two-arm clinical trials up to September 2023, sourced from Scopus, PubMed, Web of Science, and the Cochrane Library. Our primary outcomes were complete occlusion rates during mid-term and long-term follow-ups.
Updates Surg
January 2025
Department of General Surgery, San Benedetto del Tronto Hospital, AST Ascoli Piceno, San Benedetto del Tronto, Italy.
Groove pancreatitis (GP) is a chronic segmental pancreatitis which leads to altered pancreatic secretions and pancreatitis. The exact pathogenesis of GP has not been clearly identified to date but heavy smoking and chronic alcohol consumption seem to be the main factors involved. The resulting chronic pancreatitis (CP) is a debilitating disease causing abdominal pain often refractory to medical therapy, so much that the main indication for surgical treatment is intractable abdominal pain.
View Article and Find Full Text PDFMusculoskelet Surg
January 2025
Graduate Entry Medical School, University of Limerick, Co. Limerick, Republic of Ireland.
The aim is to identify the 50 most cited papers and thus the most influential papers pertaining to ACJ reconstruction, and specifically, analysing the level of evidence (LOE), article content, journals occurring, and countries represented within the 50 most cited. A search of the Web of Science database was carried out using the following terms: "Acromioclavicular joint" OR "AC joint" (Topic) AND Reconstruction OR Repair (Topic). The top 50 relevant articles were analysed in relation to citations, citation density, geographic origin of the article, year published, and article type.
View Article and Find Full Text PDFEnter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!