Purpose: The aim of this study is to investigate the clinical factors affecting on the cure rate by invasive and open surgery for gastric cancer and to establish a subgroup of patients who can be applied by the early recovery after surgery program through this retrospective analysis.
Materials And Methods: In this retrospective study, we analyzed 425 patients who underwent gastric cancer surgery between January 2011 and December 2011 and were managed with conventional clinical therapies. This clinical algorithm was made when the patient was in minimally invasive surgery group and discharged from hospital one day faster than them in open surgery group.
Results: The completion rate of the clinical pathway was 62.4%. Despite the different applications of clinical pathway, completion rate in minimally invasive surgery group was significantly higher than that of open group (P<0.001). In multivariate analysis, the surgical procedure of minimally invasive surgery (odds ratio=4.281) was the most predictable factor to complete clinical pathway. Additionally, younger patients (odds ratio=1.933) who underwent distal gastrectomy (odds ratio=1.999) without combined resection (odds ratio=3.069) were predicted to accomplish the clinical pathway without any modifications.
Conclusions: We concluded that high efficacy of the clinical pathway for gastric cancer surgery was expected to selected patients through retrospective analysis (expected completion rate=85.4%). In addition, these patients would become enrolled criteria for early recovery program in gastric cancer surgery.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC3705139 | PMC |
http://dx.doi.org/10.5230/jgc.2013.13.2.98 | DOI Listing |
Rev Gastroenterol Peru
January 2025
Hospital Nacional Dos de Mayo, Lima, Perú.
We report the case of a 68-year-old female patient who had a gastrointestinal stromal tumor involving muscularis propria of the gastric body that was removed through submucosal tunneling endoscopic resection, with favorable follow-up after 5 years, with no signs of recurrence.
View Article and Find Full Text PDFRev Gastroenterol Peru
January 2025
Infectious Diseases and Cancer Research Group, Centro de Investigaciones Clinicas, Fundacion Hospital San Pedro, Pasto, Nariño, Colombia; Colombian Research Group on Helicobacter pylori, Bogota D.C., Colombia.
The role of Helicobacter pylori in the pathogenesis of peptic ulcers and gastric adenocarcinoma is widely known; however, it is not entirely understood how bacterial infection is closely related to the genesis of follicular gastritis and some types of gastric lymphoma. Diagnosing and pathogenic mechanisms follicular gastritis remain challenging. Therefore, this article aims to examine the role of H.
View Article and Find Full Text PDFRev Gastroenterol Peru
January 2025
Departamento de Gastroenterología, Facultad de Medicina, Pontificia Universidad Católica de Chile, Santiago, Chile.
Helicobacter pylori (H. pylori) is the primary etiological agent of gastric adenocarcinoma, which affects over 60% of the global population, with a significant prevalence in Latin America. Given its impact on the affected population, it is crucial to understand the diagnostic tools available for detecting this infection.
View Article and Find Full Text PDFRev Gastroenterol Peru
January 2025
Hospital Nacional Edgardo Rebagliati Martins, Lima, Perú; Universidad San Ignacio de Loyola, Lima, Perú.
Unlabelled: Endoscopic submucosal dissection (ESD) is the technique of choice in the management of early gastric cancer. Recently, it is also considered as an absolute indication in selected cases of early undifferentiated gastric cancer (U-EGC).
Objectives: In the present study, the first documented cases of ESD in patients with U-EGC are presented and analyzed.
J Nanobiotechnology
January 2025
School of First Clinical Medical, Ningxia Medical University, Yinchuan, 750004, China.
Background: Helicobacter pylori (H. pylori), a specific bacterium capable of surviving in the acidic environment of the stomach, has been recognized as a group of causative agents of gastric cancer. Therefore, the development of mucosal vaccines against H.
View Article and Find Full Text PDFEnter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!