Introduction: In response to concerns regarding delays in transferring critically ill patients to intensive care units (ICU), a quality improvement project, using the Six Sigma process, was undertaken to correct issues leading to transfer delay.

Objective: To test the efficacy of a Six Sigma intervention to reduce transfer time and establish a patient transfer process that would effectively enhance communication between hospital caregivers and improve the continuum of care for patients.

Methods: The project was conducted at a 714-bed tertiary care hospital in Staten Island, New York. A Six Sigma multidisciplinary team was assembled to assess areas that needed improvement, manage the intervention, and analyze the results.

Results: The Six Sigma process identified eight key steps in the transfer of patients from general medical floors to critical care areas. Preintervention data and a root-cause analysis helped to establish the goal transfer-time limits of 3 h for any individual transfer and 90 min for the average of all transfers.

Conclusions: The Six Sigma approach is a problem-solving methodology that resulted in almost a 60% reduction in patient transfer time from a general medical floor to a critical care area. The Six Sigma process is a feasible method for implementing healthcare related quality of care projects, especially those that are complex.

Download full-text PDF

Source
http://dx.doi.org/10.1111/j.1945-1474.2011.00184.xDOI Listing

Publication Analysis

Top Keywords

patient transfer
12
sigma process
12
transfer time
8
general medical
8
critical care
8
sigma
7
transfer
7
care
6
sigma methodology
4
methodology reduce
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!