A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@remsenmedia.com&api_key=81853a771c3a3a2c6b2553a65bc33b056f08): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 144

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 144
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 212
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 1002
Function: getPubMedXML

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3142
Function: GetPubMedArticleOutput_2016

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Monitoring effects of remediation on natural sediment recovery in Sydney Harbour, Nova Scotia. | LitMetric

Monitoring effects of remediation on natural sediment recovery in Sydney Harbour, Nova Scotia.

Environ Monit Assess

Dillon Consulting Limited, 137 Chain Lake Drive, Halifax, NS, B3S 1B3, Canada.

Published: October 2013

Chemical contaminants were assessed in Sydney Harbour, Nova Scotia during pre-remediation (baseline) and 3 years of remediation of a former coking and steel facility after nearly a century of operation and historical pollution into the Sydney Tar Ponds (STP). Concentrations of polycyclic aromatic hydrocarbons (PAHs), polychlorinated biphenyls, metals, and inorganic parameters measured in sediments and total suspended solids in seawater indicate that the overall spatial distribution pattern of historical contaminants remains unchanged, although at much lower concentrations than previously reported due to natural sediment recovery, despite remediation activities. Measured sediment deposition rates in bottom-moored traps during baseline were low (0.4-0.8 cm year(-1)), but during dredging operations required for construction of new port facilities in the inner Sydney Harbour, sedimentation rates were equivalent to 26-128 cm year(-1). Measurements of sediment chemical contaminants confirmed that natural recovery rates of Sydney Harbour sediments were in broad agreement with predicted concentrations, or in some cases, lower than originally predicted despite remediation activities at the STP site. Overall, most measured contaminants in sediments showed little temporal variability (4 years), except for the detection of significant increases in total PAH concentrations during the onset of remediation monitoring compared to baseline. This slight increase represents only a short-term interruption in the overall natural recovery of sediments in Sydney Harbour, which were enhanced due to the positive impacts of large-scale dredging of less contaminated outer harbor sediments which were discharged into a confined disposal area located in the inner harbor.

Download full-text PDF

Source
http://dx.doi.org/10.1007/s10661-013-3157-8DOI Listing

Publication Analysis

Top Keywords

sydney harbour
20
natural sediment
8
sediment recovery
8
harbour nova
8
nova scotia
8
chemical contaminants
8
despite remediation
8
remediation activities
8
natural recovery
8
sydney
6

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!