The performance of continuous flow intermittent decant type sequencing batch (CFID) reactor treating the effluent of an UASB reactor treating domestic wastewater and operated at 8 h hydraulic retention time (HRT) was investigated. The CFID was operated at three different HRTs (22, 8 and 6 h) and three different dissolved oxygen (DO) patterns (<0.5, 2.5-3.5 and 3.5-4.5 mg/L). The highest effluent quality was observed at the 8 h HRT and 2.5-3.5 mg/L DO concentration. At this operational condition, the average BOD, TSS, ammonia nitrogen and fecal coliform removal efficiencies were 83, 90, 74 and 99 %, respectively. The CFID is a promising post-treatment option for existing UASB systems, with a final effluent quality that comply with receiving water and effluent reuse criteria.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1007/s00449-012-0831-0 | DOI Listing |
Water Environ Res
June 2023
Department of Civil and Environmental Engineering, King Faisal University, Al-Ahsa, Saudi Arabia.
A lysimeter study was conducted for 1 year to examine how the source of wastewater for irrigation impacted soil physicochemical properties and kikuyu grass (Pennisetum clandestinum) nutrient composition. The wastewater used included treated wastewater produced by a membrane bioreactor (MBR) and intermittently decanted aerated lagoon (IDAL) treatment systems. No significant differences were observed between the treatments regarding total nitrogen and total phosphorus across the depths of the columns.
View Article and Find Full Text PDFChemosphere
March 2022
Department of Civil Engineering, University of Manitoba, Winnipeg, Canada, R3T 5V6.
Achieving consistent ammonia removal in post-lagoon processes faces two major challenges impacting nitrifiers due to the unique seasonal variation of lagoon-based systems: summer to winter temperature drop and summer to fall ammonia starvation period while lagoon is removing ammonia. The objective of this study was to follow microbial diversity and define conditions that could overcome these challenges in a post-lagoon moving bed biofilm reactor (MBBR) operated at an initial surface area loading rate (SALR) of 0.3 g-NH4-N md from mesophilic (20 °C) to psychrophilic (4 °C).
View Article and Find Full Text PDFJ Environ Manage
January 2022
CSIRO Land and Water, Floreat, Western Australia, 6014, Australia. Electronic address:
Dosing alum to remove phosphorus (P) from wastewater is a common practice. However, the dosing-location and quantity of alum required to meet P discharge limits are vaguely defined. As such, utilities overdose alum to avoid noncompliance, but this leads to wastage and costs.
View Article and Find Full Text PDFEnviron Sci Pollut Res Int
December 2020
Department of Water Resource and Sanitation, Federal University Lavras, Aquenta Sol, Lavras, Minas Gerais, 37200-000, Brazil.
To ensure microbial activity and a reaction equilibrium with efficiency and energy saving, it is important to know the factors that influence microbiological nitrogen removal in wastewater. Thus, it was investigated the microorganisms and their products involved in the treatment of kennel effluents operated with different aeration times, phase 1 (7 h of continuous daily aeration), phase 2 (5 h of continuous daily aeration), and phase 3 (intermittent aeration every 2 h), monitoring chemical and physical parameters weekly, monthly microbiological, and qualitative and quantitative microbiological analyzes at the end of each applied aeration phase. The results showed a higher mean growth of nitrifying bacteria (NB) (10) and denitrifying bacteria (DB) (10) in phase with intermittent aeration, in which better total nitrogen (TN) removal performance, with 33%, was achieved, against 21% in phase 1 and 17% in phase 2, due to the longer aeration time and lower carbon/nitrogen ratio (15.
View Article and Find Full Text PDFSci Total Environ
November 2020
CSIRO Land and Water, Floreat, Western Australia 6014, Australia. Electronic address:
Intermittently Decanted Extended Aeration (IDEA) processes are widely used for wastewater treatment. However, in-depth performance evaluation of a full-scale IDEA plant is rare, making it challenging for water utilities to meet the increasingly stringent discharge requirements with these assets. This study aims to fill this gap through a comprehensive assessment of nitrogen and phosphorus removal in a full-scale IDEA plant in Australia.
View Article and Find Full Text PDFEnter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!