Background: Patients at risk of severe exacerbations contribute disproportionally to asthma mortality, morbidity and costs. We evaluated the effectiveness and costs of using 'asthma risk registers' for these patients in primary care.

Methods: In a cluster-randomised trial, 29 primary care practices identified 911 at-risk asthma patients using British asthma guideline criteria (severe asthma plus adverse psychosocial characteristics). Intervention practices added electronic alerts to identified patients' records to flag their at-risk status and received practice-based training about using the alerts to improve patient access and opportunistic management. Control practices continued routine care. Numbers of patients experiencing the primary outcome of a moderate-severe exacerbation (resulting in death, hospitalisation, accident and emergency attendance, out-of-hours contact, or a course/boost in oral prednisolone for asthma), other healthcare and medication usage, and costs over 1 year were derived from practice-based records.

Results: There was no significant effect on exacerbations (control: 46.5%; intervention: 53.6%, OR, 95% CI 1.30, 0.93 to 1.80). However, this composite outcome masked relative reductions in intervention patients experiencing hospitalisations (OR 0.50, 95% CI 0.26 to 0.94), accident and emergency (OR 0.74, 95% CI 0.42 to 1.31) and out-of-hours contacts (OR 0.79, 95% CI 0.45 to 1.37); and a relative increase in prednisolone prescription for exacerbations (OR 1.31, 95% CI 0.92 to 1.85). Furthermore, prescription of nebulised short-acting β-agonists reduced and long-acting β-agonists increased for intervention relative to control patients. The adjusted mean per patient healthcare cost was £138.21 lower (p=0.837) among intervention practices.

Conclusion: Using asthma risk registers in primary care did not reduce treated exacerbations, but reduced hospitalisations and increased prescriptions of recommended preventative therapies without increasing costs.

Download full-text PDF

Source
http://dx.doi.org/10.1136/thoraxjnl-2012-202093DOI Listing

Publication Analysis

Top Keywords

primary care
12
severe asthma
8
effectiveness costs
8
patients experiencing
8
accident emergency
8
asthma
7
patients
6
costs
5
primary
5
intervention
5

Similar Publications

Importance: While urban counties maintain higher densities of ophthalmologists than rural counties, the geographic distribution of ophthalmic surgical subspecialists has not yet been elucidated. A potential workforce discrepancy may impact the burden of care faced by rural surgeons.

Objective: To assess the geographic distribution of the ophthalmic subspecialist surgeon workforce and evaluate factors associated with practicing in rural areas.

View Article and Find Full Text PDF

A Couple-Based Intervention for Chinese Older Adults With Type 2 Diabetes: A Randomized Clinical Trial.

JAMA Netw Open

January 2025

Department of Medical Statistics and Epidemiology, School of Public Health, Sun Yat-sen University, Guangzhou, China.

Importance: Spousal involvement in diabetes care is recommended theoretically, but effectiveness in clinical settings and among diverse populations is unclear.

Objective: To test the effect of a couple-based intervention among Chinese older patients with type 2 diabetes and their spouses.

Design, Setting, And Participants: This multicenter randomized clinical trial comprised 2 arms: a couple-based intervention arm and an individual-based control.

View Article and Find Full Text PDF

Importance: Influenza vaccination remains the most important intervention to prevent influenza morbidity and mortality among nursing home residents. The additional effectiveness of recombinant influenza vaccine vs standard dose vaccines was demonstrated in outpatient older adults but has not been evaluated in nursing home populations.

Objective: To compare hospitalization rates among residents in nursing homes immunized with a recombinant vs a standard dose egg-based influenza vaccine.

View Article and Find Full Text PDF

Background: Loss to follow-up to HIV care following delivery puts birthing parents with HIV at higher risk of loss of viral suppression, disease progression, and HIV partner transmission. This study assessed factors associated with retention in postpartum HIV care.

Methods: This is a retrospective cohort study at a single academic medical center and included patients followed from January 2014 to December 2022.

View Article and Find Full Text PDF

Importance: The current standard-of-care salvage therapy in relapsed/refractory classic Hodgkin lymphoma (cHL) includes consolidation high-dose chemotherapy (HDCT)/autologous stem cell transplant (aSCT).

Objective: To investigate whether presalvage risk factors and fludeoxyglucose-18 (FDG) positron emission tomography (PET) response to reinduction chemotherapy can guide escalation or de-escalation between HDCT/aSCT or transplant-free consolidation with radiotherapy to minimize toxic effects while maintaining high cure rates.

Design, Setting, And Participants: EuroNet-PHL-R1 was a nonrandomized clinical trial that enrolled patients younger than 18 years with first relapsed/refractory cHL across 68 sites in 13 countries in Europe between January 2007 and January 2013.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!