Dissolved air flotation (DAF) incorporating filtration (DAFF) is used at the Bolivar wastewater treatment plant (WWTP) to polish lagoon effluent for reuse. Elevated algal populations are frequently experienced and can lead to increased coagulant requirements and process control issues. Streaming current detectors (SCDs) and a charge demand analyser (CDA) were used to monitor the full-scale plant. This was followed by an optimisation study using a pilot plant with a CDA. It was found that the normal operational charge demand range for DAF at Bolivar was between -46 and -40 μeq L(-1). Decreasing the pH of coagulation reduced coagulant consumption and facilitated more sensitive CDA responses to changes in alum dose.

Download full-text PDF

Source
http://dx.doi.org/10.2166/wst.2012.373DOI Listing

Publication Analysis

Top Keywords

dissolved air
8
lagoon effluent
8
treatment plant
8
charge demand
8
optimising dissolved
4
air flotation/filtration
4
flotation/filtration treatment
4
treatment algae-laden
4
algae-laden lagoon
4
effluent surface
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!