Background: The length of hospital stay (LOS) for community-acquired pneumonia (CAP) varies considerably, even though this factor has a major impact on the cost of care. We aimed to determine whether the use of a 3-step critical pathway is safe and effective in reducing duration of intravenous antibiotic therapy and length of stay in hospitalized patients with CAP.

Methods: We randomly assigned 401 adults who required hospitalization for CAP to follow a 3-step critical pathway including early mobilization and use of objective criteria for switching to oral antibiotic therapy and for deciding on hospital discharge or usual care. The primary end point was LOS. Secondary end points were the duration of intravenous antibiotic therapy, adverse drug reactions, need for readmission, overall case-fatality rate, and patients' satisfaction.

Results: Median LOS was 3.9 days in the 3-step group and 6.0 days in the usual care group (difference, -2.1 days; 95% CI, -2.7 to -1.7; P < .001). Median duration of intravenous antibiotic therapy was 2.0 days in the 3-step group and 4.0 days in the usual care group (difference, -2.0 days; 95% CI, -2.0 to -1.0; P < .001). More patients assigned to usual care experienced adverse drug reactions (4.5% vs 15.9% [difference, -11.4 percentage points; 95% CI, -17.2 to -5.6 percentage points; P < .001]). No significant differences were observed regarding subsequent readmissions, case fatality rate, and patients' satisfaction with care.

Conclusions: The use of a 3-step critical pathway was safe and effective in reducing the duration of intravenous antibiotic therapy and LOS for CAP and did not adversely affect patient outcomes. Such a strategy will help optimize the process of care of hospitalized patients with CAP, and hospital costs would be reduced.

Trial Registration: isrctn.org Identifier: ISRCTN17875607.

Download full-text PDF

Source
http://dx.doi.org/10.1001/archinternmed.2012.1690DOI Listing

Publication Analysis

Top Keywords

antibiotic therapy
24
duration intravenous
20
intravenous antibiotic
20
3-step critical
16
critical pathway
16
usual care
16
therapy length
8
length stay
8
community-acquired pneumonia
8
pathway safe
8

Similar Publications

Chronic fracture-related infection is a complex, costly clinical problem with a wide spectrum of clinical presentations. The goals of treatment are infection control with a healed fracture covered by well-vascularized soft tissue and improvement of patient pain and function. Management is both medical, with culture-targeted antimicrobial agents, and surgical, requiring meticulous irrigation and débridement.

View Article and Find Full Text PDF

Fracture-related infection (FRI) is a serious complication that occurs primarily in surgically treated fractures. FRIs occur when bacteria enter the site of bony injury and alter the healing inflammatory response within the bone. This can prevent bone regeneration and can lead to long-lasting complications such as chronic infection, pain, nonunion, and amputation.

View Article and Find Full Text PDF

Following fracture fixation, fracture-related infection (FRI) is a common complication and requires systematic evaluation to allow for an optimal treatment strategy. A high index of suspicion is necessary for early and timely diagnosis, to diagnose occult infection, and to prevent untreated infections from worsening. Diagnosis of FRI includes evaluation based on history and clinical examination, surgical exploration, serum inflammatory markers, imaging modalities, microbiology, histopathology, and, when needed, molecular biology.

View Article and Find Full Text PDF

Gun-related violence is becoming increasingly more common in the United States, and ballistic injuries pose a challenge to the orthopaedic surgeon on trauma call. The guiding principles of trauma care are almost exclusively based on blunt trauma, and the management principles do not always translate. Ballistic long bone fractures, particularly of the lower extremity, can often be managed with similar principles, although the injury pattern can make restoration of anatomic alignment a challenge.

View Article and Find Full Text PDF

Limb salvage surgery has become the primary means of treatment for patients with malignant tumors of the extremities and pelvis. For these patients, endoprostheses have become the principal means to reconstruct the extremity following an oncologic resection because they offer an off-the-shelf-option that is modular, cost effective, and durable. As with other forms of arthroplasty, several modes of failure can occur, with infection being common.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!