As part of the CERN accelerator complex upgrade, a new linear accelerator for H(-) (Linac4) is under construction. The ion source design is based on the non-caesiated DESY RF-driven ion source, with the goal of producing an H(-) beam of 80 mA beam current, 45 keV beam energy, 0.4 ms pulse length, and 2 Hz repetition rate. The source has been successfully commissioned for an extraction voltage of 35 kV, corresponding to the one used at DESY. Increasing the extraction voltage to 45 kV has resulted in frequent high voltage breakdowns in the extraction region caused by evaporating material from the electron dump, triggering a new design of the extraction and electron dumping system. Results of the ion source commissioning at 35 kV are presented as well as simulations of a new pulsed extraction system for beam extraction at 45 kV.

Download full-text PDF

Source
http://dx.doi.org/10.1063/1.3670344DOI Listing

Publication Analysis

Top Keywords

ion source
16
extraction system
8
extraction voltage
8
extraction
7
source
5
system linac4
4
ion
4
linac4 ion
4
source cern
4
cern accelerator
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!