Does overall treatment time impact on survival after whole-brain radiotherapy for brain metastases?

Clin Transl Oncol

Department of Oncology and Palliative Medicine, Nordland Hospital, Bodo, Norway.

Published: December 2011

PURPOSE To evaluate whether reduced overall treatment time (OTT), i.e., administration of more than 5 fractions per week, or uncompensated treatment interruption resulting in increased OTT influences survival of patients treated with whole-brain radiotherapy (WBRT) for brain metastases. METHODS Retrospective multi-institutional intention-to-treat study including 233 patients treated with primary WBRT (prescribed dose 10 fractions of 3 Gy; no previous SRS or surgery) administered over 10-38 days. Four groups were studied: OTT 10-11 vs. 12 days, 13-15 or >15 days. RESULTS Fourteen patients (6%) failed to complete WBRT and received 3-9 fractions (median 7). Their median survival was 0.5 months as compared to 3 months in patients who completed WBRT. No significant impact of OTT on survival was found. Median survival was 1.5, 2.9, 3.0 and 3.1 months in the four groups mentioned above. CONCLUSIONS Compensation for unintended treatment interruption is generally recommended but might not always be feasible. Depending on histological tumour type or expected repopulation, prognostic factors and neurological status, it might be acceptable to complete an interrupted course of WBRT without compensation in selected patients. While survival might be largely independent from OTT, it should also be evaluated whether this parameter has any impact on quality of life and duration of palliation.

Download full-text PDF

Source
http://dx.doi.org/10.1007/s12094-011-0750-6DOI Listing

Publication Analysis

Top Keywords

treatment time
8
whole-brain radiotherapy
8
treatment interruption
8
patients treated
8
median survival
8
survival months
8
survival
6
ott
5
patients
5
wbrt
5

Similar Publications

Objective: Skull base chordomas (SBCs) often present with cranial nerve (CN) VI deficits. Studies have not assessed the prognosis and predictive factors for CN VI recovery among patients presenting with CN VI deficits.

Methods: The medical records of patients who underwent resection for primary chordoma from 2001 to 2020 were reviewed.

View Article and Find Full Text PDF

Digital Frequency Customized Relieving Sound for Chronic Subjective Tinnitus Management: Prospective Controlled Study.

J Med Internet Res

January 2025

ENT Institute and Department of Otorhinolaryngology, Eye & ENT Hospital, Fudan University, Shanghai, China.

Background: Tinnitus is a major health issue, but currently no tinnitus elimination treatments exist for chronic subjective tinnitus. Acoustic therapy, especially personalized acoustic therapy, plays an increasingly important role in tinnitus treatment. With the application of smartphones, personalized acoustic stimulation combined with smartphone apps will be more conducive to the individualized treatment and management of patients with tinnitus.

View Article and Find Full Text PDF

Objective: The purpose of this study was to present a newly designed 3D-printed personalized model (3D PPM) of a radiofrequency needle guide with a maxillary fixation for gasserian ganglion (GG) puncture.

Methods: Implementation of 3D CT-guided radiofrequency therapy of the GG with and without use of 3D PPM was analyzed. The following parameters were assessed: radiation time, dose area product, air kerma reference point, pain severity during the puncture needle insertion, prosopalgia regression degree (according to visual analog scale) and the severity of facial numbness (according to the Barrow Neurological Institute scale) in the early postoperative period, and postpuncture complications.

View Article and Find Full Text PDF

Objective: This study aimed to introduce and evaluate a novel software-based system, BioTrace, designed for real-time monitoring of thermal ablation tissue damage during image-guided radiofrequency ablation for hepatocellular carcinoma (HCC).

Methods: BioTrace utilizes a proprietary algorithm to analyze the temporo-spatial behavior of thermal gas bubble activity during ablation, as seen in conventional B-mode ultrasound imaging. Its predictive accuracy was assessed by comparing the ablation zones it predicted with those annotated by radiologists using contrast-enhanced computed tomography (CECT) 24 hours post-treatment, considered the gold standard.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!