A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 1034
Function: getPubMedXML

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3152
Function: GetPubMedArticleOutput_2016

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Cost function analysis for solid waste management: a developing country experience. | LitMetric

Cost function analysis for solid waste management: a developing country experience.

Waste Manag Res

Department of Civil and Natural Resources Engineering, University of Canterbury, Christchurch, New Zealand.

Published: May 2012

The need for improved cost planning methods for solid waste management (SWM) is particularly strong in emerging economies where problems are severe, expectations for improvements are high, but finances are constrained. Estimating cost functions is suggested as an improved cost planning method. The research uses 1999 data from 298 Indian municipalities, covering over 140 million people. Stepwise multiple regression involving eight predictor variables was conducted on costs to detect any statistically significant correlations. The average costs on either a per tonne or per capita basis are most influenced by the total number of staff employed per capita or per tonne. The results are believed to be due to labour costs being such a high fraction of total costs in developing countries. Due to high variability in labour intensity between municipalities the data showed no clear correlation between per tonne or per capita costs and population, indicating no economy-of-scale. The data used here are subject to significant conjecture over their quality and age; however, the unique nature of the study should help future researchers investigating costs in emerging economies.

Download full-text PDF

Source
http://dx.doi.org/10.1177/0734242X11425565DOI Listing

Publication Analysis

Top Keywords

solid waste
8
waste management
8
improved cost
8
cost planning
8
emerging economies
8
tonne capita
8
costs
6
cost
4
cost function
4
function analysis
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!