A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

An effective multi-objective approach to prioritization of sewer pipe inspection. | LitMetric

An effective multi-objective approach to prioritization of sewer pipe inspection.

Water Sci Technol

Civil and Environmental Engineering Department, Technical University of Bari, via Orabona 4, 70125, Bari, Italy.

Published: October 2009

AI Article Synopsis

  • The first step in proactive sewer rehabilitation is to evaluate the condition of sewer conduits, focusing on a risk-based approach to prioritize which ones to inspect based on failure risks and inspection costs.
  • A multi-objective optimization problem is solved using a multi-objective genetic algorithm (MOGA) to balance the total survey costs with expected emergency repair costs, identifying efficient inspection programs.
  • A post-processing method for MOGA solutions is introduced, allowing for the ranking of inspection priorities, which helps decision-makers create effective inspection sequences within their budget, as demonstrated on a large UK sewer system.

Article Abstract

The first step in the decision making process for proactive sewer rehabilitation is to assess the condition of conduits. In a risk-based decision context the set of sewers to be inspected first should be identified based on the trade-off between the risk of failures and the cost of inspections. In this paper the most effective inspection works are obtained by solving a multi-objective optimization problem where the total cost of the survey programme and the expected cost of emergency repairs subsequent to blockages and collapses are considered simultaneously. A multi-objective genetic algorithm (MOGA) is used to identify a set of Pareto-optimal inspection programmes. Regardless of the proven effectiveness of the genetic-algorithm approach, the scrutiny of MOGA-based inspection strategies shows that they can differ significantly from each other, even when having comparable costs. A post-processing of MOGA solutions is proposed herein, which allows priority to be assigned to each survey intervention. Results are of practical relevance for decision makers, as they represent the most effective sequence of inspection works to be carried out based on the available funds. The proposed approach is demonstrated on a real large sewer system in the UK.

Download full-text PDF

Source
http://dx.doi.org/10.2166/wst.2009.432DOI Listing

Publication Analysis

Top Keywords

inspection works
8
inspection
5
effective multi-objective
4
multi-objective approach
4
approach prioritization
4
prioritization sewer
4
sewer pipe
4
pipe inspection
4
inspection step
4
step decision
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!