Severity: Warning
Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 176
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML
File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
Unlabelled: With PET becoming more widely used, there is an increase in the number of imaging centers being forced to rely on distant suppliers of (18)F-FDG. Because of the large distances between major urban centers, this is particularly true for PET centers in Canada.
Methods: Our PET center, located in Winnipeg, Manitoba, Canada, currently purchases (18)F-FDG from a commercial vendor located more than 1,000 km from Winnipeg, necessitating transport by commercial airline cargo. This dependence on air transport and a distant supplier creates a situation in which our (18)F-FDG supply is less reliable than it would be with onsite production. In this article, we offer insight into the obstacles we have encountered in imaging with a distant supplier of (18)F-FDG and the solutions we have implemented to minimize the disruption to our patients and maximize the number of scans performed each year.
Results: The development of contingency plans and protocols designed to suit our operating environment has allowed us to increase the number of patient scans obtained from 659 in year 1 to 993 in year 3, an increase of 51%, despite an increase in our actual number of scan days of only 24%. (18)F-FDG injection timetables are presented for a variety of scenarios including normal delivery, low shipped activity, and delayed delivery.
Conclusion: Through the careful establishment of contingency protocols and management of (18)F-FDG shipments, patient throughput can be increased and disruptions minimized.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.2967/jnmt.109.062950 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!