A critical pathway for successful outpatient ureteral reimplantation: a nursing perspective.

J Perianesth Nurs

Beachwood Ambulatory Surgery Center, Cleveland Clinic, Cleveland, OH, USA.

Published: June 2009

Vesicoureteral reflux is a common pediatric urologic condition. Traditionally, surgical treatment of this condition requires a hospital stay of 1 to 6 days. Our experience has shown that both unilateral and bilateral extravesical ureteral reimplantation can be performed safely in the ambulatory surgery setting. Our perianesthesia care revolves around the concept of family-centered care. We have found that the key to our critical pathway involves both the patient and the family in every part of perianesthesia care. This "team" approach can be adapted for any pediatric procedure.

Download full-text PDF

Source
http://dx.doi.org/10.1016/j.jopan.2009.03.009DOI Listing

Publication Analysis

Top Keywords

critical pathway
8
ureteral reimplantation
8
perianesthesia care
8
pathway successful
4
successful outpatient
4
outpatient ureteral
4
reimplantation nursing
4
nursing perspective
4
perspective vesicoureteral
4
vesicoureteral reflux
4

Similar Publications

Background: Pancreatic cancer is characterized by a complex tumor microenvironment that hinders effective immunotherapy. Identifying key factors that regulate the immunosuppressive landscape is crucial for improving treatment strategies.

Methods: We constructed a prognostic and risk assessment model for pancreatic cancer using 101 machine learning algorithms, identifying OSBPL3 as a key gene associated with disease progression and prognosis.

View Article and Find Full Text PDF

Background: Perilla frutescens (L.) Britt. (Lamiaceae) leaves are essential culinary and medicinal herbs, native to East Asian countries.

View Article and Find Full Text PDF

Exercise promotes peripheral glycolysis in skeletal muscle through miR-204 induction via the HIF-1α pathway.

Sci Rep

January 2025

Laboratory of Biochemistry, College of Veterinary Medicine, Chungnam National University, 99 Daehak-Ro, Yuseong-Gu, Daejeon, 34134, Korea.

The mechanisms underlying exercise-induced insulin sensitization are of great interest, as exercise is a clinically critical intervention for diabetic patients. Some microRNAs (miRs) are secreted from skeletal muscle after exercise where they regulate insulin sensitivity, and have potential as diagnostic markers in diabetic patients. miR-204 is well-known for its involvement in development, cancer, and metabolism; however, its role in exercise-induced glycemic control remains unclear.

View Article and Find Full Text PDF

Lactylation modulation identifies key biomarkers and therapeutic targets in KMT2A-rearranged AML.

Sci Rep

January 2025

National Clinical Research Center for Hematologic Diseases, Jiangsu Institute of Hematology, The First Affiliated Hospital of Soochow University, Suzhou, China.

Acute Myeloid Leukemia (AML) with KMT2A rearrangements (KMT2Ar), found on chromosome 11q23, is often called KMT2A-rearranged AML (KMT2Ar-AML). This variant is highly aggressive, characterized by rapid disease progression and poor outcomes. Growing knowledge of epigenetic changes, especially lactylation, has opened new avenues for investigation and management of this subtype.

View Article and Find Full Text PDF

Due to considerable tumour heterogeneity, stomach adenocarcinoma (STAD) has a poor prognosis and varies in response to treatment, making it one of the main causes of cancer-related mortality globally. Recent data point to a significant role for metabolic reprogramming, namely dysregulated lactic acid metabolism, in the evolution of STAD and treatment resistance. This study used a series of artificial intelligence-related approaches to identify IGFBP7, a Schlafen family member, as a critical factor in determining the response to immunotherapy and lactic acid metabolism in STAD patients.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!