Severity: Warning
Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 176
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML
File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
* Quality Control (QC) in Point of Care Testing (PoCT) is often thought of as a complex issue; however intelligent system analysis can simplify matters and greatly increase the chances of a well controlled system. What we want to achieve is a QC program which adequately controls the PoCT system, but does not excessively contribute to the operating costs or complexity of maintaining a PoCT instrument, or network of instruments. * Don't neglect effective pre-analytical work: good documentation, operator training, monitoring, and analyser maintenance programs are essential, as for any analyser. * Look closely at your analyser: Is it a "laboratory type" instrument or cartridge or strip based? Can it perform multiple test types or a single test only? How is it calibrated? Does it have built in self-check capabilities or an electronic check cartridge? Is the sample in contact with the instrument? What are the cartridge/strip/reagent storage requirements? * Establish where the analysis is taking place and which system component is involved. * Tailor your QC program to target this component, but still check the system as a whole. * A common approach is to check cartridges/strips on delivery and run a QA sample at least monthly to check storage conditions and operator performance. If there is no independent electronic instrument check, daily QC checks are also recommended. * Don't be afraid to stray beyond conventional QC models if necessary. Some PoCT systems are not adequately controlled by the application of conventional QC alone.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC2556589 | PMC |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!