Severity: Warning
Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 176
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 1034
Function: getPubMedXML
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3152
Function: GetPubMedArticleOutput_2016
File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
Inhibition of the startle eyeblink response at long lead intervals has been hypothesized to occur when attention is directed away from the modality of the startle stimulus, particularly if attention is directed to a stimulus of high perceptual load. In a test of this hypothesis, participants performed a delayed-matching-to-sample task. On each trial a pattern of dots (the sample) was followed by a second pattern of dots (the target). The task was to say whether the sample and target patterns matched. Perceptual load was manipulated by varying the number of dots in the sample. Auditory startle stimuli were presented 1200 ms after onset of the samples. A linear increase in startle magnitude was found as the number of dots increased. The results are not consistent with the hypothesis that startle inhibition occurs when the lead and startle stimuli are in different modalities under conditions of high perceptual load.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1111/j.1469-8986.2006.00420.x | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!