Regulatory pressures and capacity constraints are forcing the biopharmaceutical industry to consider employing multiproduct manufacturing facilities running on a campaign basis. The need for such flexible and cost-effective manufacture poses a significant challenge for planning and scheduling. This paper reviews the problem of planning and scheduling of biopharmaceutical manufacture and presents a methodology for the planning of multiproduct biopharmaceutical manufacturing facilities. The problem is formulated as a mixed integer linear program (MILP) to represent the relevant decisions required within the planning process and is tested on two typical biopharmaceutical industry planning problems. The proposed formulation is compared with an industrial rule based approach, which it outperforms in terms of profitability. The results indicate that the developed formulation offers an effective representation of the planning problem and would be a useful decision tool for manufacturers in the biopharmaceutical industry particularly at times of limited manufacturing capacity.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1021/bp0501571 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!