Before the commissioning of SPring-8, the in-vacuum hybrid undulator developed at SPring-8 had been brought to the ESRF for the first beam test in the summer of 1996. The purpose of this test was to investigate the influence of the in-vacuum undulator on the beam and check its vacuum system. However, heating by the resistive wall impedance turned out to be a critical issue for the in-vacuum undulators.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1107/S0909049597014325 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!