A survey was sent to 500 members of the National Academy of Neuropsychology (NAN) in order to tally clinical test evaluation times. A return of 118 useable responses resulted in the table of "clinical times" (e.g., time required to administer, score, interpret, and report) presented in this paper. These are proposed as a practical guide for billing third-party payers.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1076/1385-4046(199911)13:04;1-Y;FT433 | DOI Listing |
Heliyon
January 2025
Engineering School of Sustainable Infrastructure and Environment, University of Florida, Gainesville, FL, United States.
This research deals with the high project completion variability by presenting a new method to decrease such variability in repetitive construction projects. To achieve this, a Fixed Start Method (FSM) -where the starts of each activity with a high level of probabilistic confidence for the planned project duration are fixed- was applied, where the high level of probabilistic confidence obtained was optimized with the use of the metaheuristic algorithm called Simulated Annealing (SA). This procedure evaluated the project completion in a case study based on the coefficient of variance (COV) of the resulting standard deviation, mean, and temperature selected for the SA.
View Article and Find Full Text PDFTrials
January 2025
Physiotherapy Department, Department of Pathology and Surgery, Miguel Hernández University, San Juan de Alicante, Alicante, Spain.
Background: Women's football has experienced exponential growth over the last 10 years. Its popularity is associated with an increase in ACL injuries. They constitute a major current problem as they account for 43% of the injury burden during the sports season.
View Article and Find Full Text PDFSci Rep
January 2025
Cardiff School of Technologies, Cardiff Metropolitan University, Cardiff, UK.
In general, edge computing networks are based on a distributed computing environment and hence, present some difficulties to obtain an appropriate load balancing, especially under dynamic workload and limited resources. The conventional approaches of Load balancing like Round-Robin and Threshold-based load balancing fails in scalability and flexibility issues when applied to highly variable edge environments. To solve the problem of how to achieve steady-state load balance and provide dynamic adaption to edge networks, this paper proposes a new framework that using PCA and MDP.
View Article and Find Full Text PDFSci Rep
January 2025
School of Information Engineering, Sanming University, Sanming, 365004, China.
Today, with the increasing use of the Internet of Things (IoT) in the world, various workflows that need to be stored and processed on the computing platforms. But this issue, causes an increase in costs for computing resources providers, and as a result, system Energy Consumption (EC) is also reduced. Therefore, this paper examines the workflow scheduling problem of IoT devices in the fog-cloud environment, where reducing the EC of the computing system and reducing the MakeSpan Time (MST) of workflows as main objectives, under the constraints of priority, deadline and reliability.
View Article and Find Full Text PDFSci Rep
January 2025
Rocket Force University of Engineering, Xi'an, 710025, P. R. China.
With the increasing intelligence and diversification of communication interference in recent years, communication interference resource scheduling has received more attention. However, the existing interference scenario models have been developed mostly for remote high-power interference with a fixed number of jamming devices without considering power constraints. In addition, there have been fewer scenario models for short-range distributed communication interference with a variable number of jamming devices and power constraints.
View Article and Find Full Text PDFEnter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!