Severity: Warning
Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 176
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML
File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
The project described in this paper concerns the assurance of quality in biomedical equipment management. The project commenced in 1988 with the establishment of the Clinical Engineering Department at the General Hospital of Bolzano, which was entrusted with the task of managing all biomedical equipment installed within its health institutions. To ensure the systematic and organic management of biomedical technology, new technical and administrative procedures were introduced. The results achieved have been validated both through a detailed analysis of staff replies to a specific questionnaire and on the basis of several objective indicators, such as maintenance costs and equipment breakdown times.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1097/00004669-199603000-00011 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!