A new trigger program is proposed to realize the synchronization of high speed framing camera (HSFC) and intense electron-beam accelerator (IEBA). The trigger program which include light signal acquisition radiated from main switch of IEBA and signal processing circuit could provide a trigger signal with rise time of 17 ns and amplitude of about 5 V. First, the light signal was collected by an avalanche photodiode (APD) module, and the delay time between the output voltage of APD and load voltage of IEBA was tested, it was about 35 ns.
View Article and Find Full Text PDFA radial-current aqueous resistive solution load was applied to characterize a laser triggered transformer-type accelerator. The current direction in the dummy load is radial and is different from the traditional load in the axial. Therefore, this type of dummy load has smaller inductance and fast response characteristic.
View Article and Find Full Text PDFSichuan Da Xue Xue Bao Yi Xue Ban
January 2010
Objective: To establish a method for detection of M. tuberculosis by molecular beacon real-time PCR and evaluate its application in the clinical detection of M. tuberculosis.
View Article and Find Full Text PDF