Background: The survival rate of cemented knee prosthesis depends among other factors on optimal cement-bone contact, nevertheless no standard exists for cementing technique of tibial components. The aim of this study was to determine which tibial surface preparation technique leads to the best bone-cement contact.
Materials And Methods: HUMAN TIBIAL PLATEAU SPECIMENS WERE CLEANED IN FOUR DIFFERENT WAYS BEFORE CEMENTING: a) no cleaning, b) manual syringe irrigation, c) fracture brush cleaning, and d) pulsatile jet-lavage.