Sand-cement-bound screed floor layers are at risk of work-related lower back pain, lumbosacral radicular syndrome and knee osteoarthritis, given their working technique of levelling screed with their trunk bent while mainly supported by their hands and knees. To reduce the physical demands of bending of the trunk and kneeling, a manually movable screed-levelling machine was developed for floor layers in the Netherlands. The aim of this paper is to estimate the potential health gains of working with a manually movable screed-levelling machine on the risk of lower back pain (LBP), lumbosacral radicular syndrome (LRS) and knee osteoarthritis (KOA) compared to traditional working techniques.
View Article and Find Full Text PDFBackground: International consensus is needed on case definitions of work-related musculoskeletal disorders and diseases (MSDs) for use in epidemiological research. We aim to: 1) study what information is needed for the case definition of work-related low back pain (LBP), lumbosacral radicular syndrome (LRS), subacromial pain syndrome (SAPS), carpal tunnel syndrome (CTS), lateral and medial elbow tendinopathy, and knee and hip osteoarthritis, and to 2) seek consensus among occupational health professionals/researchers regarding the case definitions of these work-related MSDs.
Methods: A two-round Delphi study was conducted with occupational health professionals/researchers from 24 countries.
To improve the use of ergonomics tools by construction workers, the effect of two guidance strategies - a face-to-face strategy (F2F) and an e-guidance strategy (EG) - of a participatory ergonomics intervention was studied. Twelve construction companies were randomly assigned to the F2F group or the EG group. The primary outcome measure, the percentage of workers using ergonomics tools, and secondary outcome measures - work ability, physical functioning and limitations due to physical problems - were assessed using surveys at baseline and after 6 months.
View Article and Find Full Text PDFUnlabelled: To gain insight into the process of applying two guidance strategies - face-to-face (F2F) or e-guidance strategy (EC) - of a Participatory Ergonomics (PE) intervention and whether differences between these guidance strategies occur, 12 construction companies were randomly assigned to a strategy. The process evaluation contained reach, dose delivered, dose received, precision, competence, satisfaction and behavioural change of individual workers. Data were assessed by logbooks, and questionnaires and interviews at baseline and/or after six months.
View Article and Find Full Text PDFElectrical screed levelling machines are developed to reduce kneeling and trunk flexion of sand-cement-bound screed floor layers. An observational intervention study among 10 floor layers was performed to assess the differences between a self-propelled and a manually moved machine. The outcome measures were work demands, production time, perceived load, discomfort and applicability.
View Article and Find Full Text PDFTeam lifting and carrying is advised when loads exceed 25 kg and mechanical lifting is not feasible. The aim of this study was to assess mean, maximum and variability of peak lumbar compression forces which occur daily at construction sites. Therefore, 12 ironworkers performed 50-kg two-worker and 100-kg four-worker lifting and carrying tasks in a laboratory experiment.
View Article and Find Full Text PDFUnlabelled: The objective of this study was to assess differences in work demands, energetic workload and workers' discomfort and physical effort in two regularly observable workdays in ironwork; one where loads up to 50kg were handled with two persons manually (T50) and one where loads up to 100kg were handled manually with four persons (T100). Differences between these typical workdays were assessed with an observational within-subject field study of 10 ironworkers. No significant differences were found for work demands, energetic workload or discomfort between T50 and T100 workdays.
View Article and Find Full Text PDFBackground: More than seven out of 10 Dutch construction workers describe their work as physically demanding. Ergonomic measures can be used to reduce these physically demanding work tasks. To increase the use of ergonomic measures, employers and workers have to get used to other working methods and to maintaining them.
View Article and Find Full Text PDFIronworkers frequently perform heavy lifting tasks in teams of two or four workers. Team lifting could potentially lead to a higher variation in peak lumbar compression forces than lifts performed by one worker, resulting in higher maximal peak lumbar compression forces. This study compared single-worker lifts (25-kg, iron bar) to two-worker lifts (50-kg, two iron bars) and to four-worker lifts (100-kg, iron lattice).
View Article and Find Full Text PDFLifting and carrying heavy loads occur frequently among ironworkers and result in high prevalence and incidence rates of low back complaints, injuries and work-disability. From a health perspective, little information is available on the effect of team lifting on work demands and workload. Therefore, the objective of this study was to compare the effects of team lifting of maximally 50 kg by two ironworkers (T50) with team lifting of maximally 100 kg by four ironworkers (T100).
View Article and Find Full Text PDFObjective: Hospitalized patients are at risk for adverse events such as unexpected cardiac arrest or admission to an Intensive Care Unit (ICU). Prior to these adverse events these patients often have derangements in vital signs that are not recognized and treated adequately. To identify and treat those patients at risk, our hospital implemented a rapid response system in 2004.
View Article and Find Full Text PDF