To solve the problem of controlling mining in the open-pit mine end slope fire-burned area, applying multivariate function fitting to the roof and floor modeling of multi-coal seam open pit mines, introducing the factor of coal quality changes in the fire-burned area, determining coal quality information at each location through proximate analysis of coal, to establish the net profit model of the mining area, it is determined the net profit of each mining position by numerical integration, the final mining position was determined without failure by calculating the slope stability based on the numerical simulation of strength reduction. Taking the Dananhu No. 2 open-pit mine in Hami, Xinjiang, China as the engineering background, the fire-burned area III within the southern end slope boundary of the first mining area is 240 m.
View Article and Find Full Text PDFOpen-pit mine pavement dust dries and breaks easily. As such, a composite pavement dust suppressant with good wettability, moisturizing, coagulation, and antifreezing properties in winter was investigated. Monomer screening and orthogonal experiments were conducted, using evaporation rate, permeability rate, viscosity, and freezing point as evaluation indexes.
View Article and Find Full Text PDF