The objective of this study is to develop a mechanistic model to predict the long-term dynamic performance of High-Rate Activated Sludge (HRAS) process, including the removal of carbon (COD), nitrogen (N), and phosphorus (P). The model was formulated with inspiration from Activated Sludge Models No. 1 and 3 (ASM1 and ASM3) to incorporate essential mechanisms, such as adsorption and storage substrate, specific to HRAS systems.
View Article and Find Full Text PDFAchieving a neutral/positive energy balance without compromising discharge standards is one of the main goals of wastewater treatment plants (WWTPs) in terms of sustainability. Aerobic granular sludge (AGS) technology promises high treatment performance with low energy and footprint requirement. In this study, high-rate activated sludge (HRAS) process was coupled to AGS process as an energy-efficient pre-treatment option in order to increase energy recovery from municipal wastewater and decrease the particulate matter load of AGS process.
View Article and Find Full Text PDFEnergy-rich sludge can be obtained from primary clarifiers preceding biological reactors. Alternatively, the incoming wastewater can be sent to a very-high-loaded activated sludge system, i.e.
View Article and Find Full Text PDF