In this paper the nitrogen elimination rates of different constructed wetland (CW) designs reported in literature are compared with those obtained for outdoor and indoor 2-stage vertical flow (VF) systems. The outdoor system is located about 150 km west of Vienna. Both stages are planted with Phragmites australis and the system has been operated for 4 years continuously.
View Article and Find Full Text PDF