The extraction of oil is accompanied by water and sediments that, mixed with the oil, cause the formation of scale depositions in the pipelines walls promoting the reduction of the inner diameter of the pipes, making it difficult for the fluids to pass through interest. In this sense, there is a need to control the formation of these depositions to evaluate preventive and corrective measures regarding the waste management of these materials, as well as the optimization of oil extraction and transport processes. Noninvasive techniques such as gamma transmission and scattering can support the determination of the thickness of these deposits in pipes.
View Article and Find Full Text PDF