The RF-driven negative ion source testbed BATMAN upgrade is being developed at IPP Garching in the framework of the ion source development for ITER and DEMO neutral beam injection systems. The testbed has recently been enhanced to allow for steady state operation with a focus on beam optics studies. The previous titanium sublimation pumps and inertial calorimeter limited the beam pulse length to about 6 s every 3 min.
View Article and Find Full Text PDF