Publications by authors named "Ph Lotte"

The present work concerns the measurements obtained with the Tungsten (W) Environment in Steady-state Tokamak (WEST) visible spectroscopy system during the first experimental campaign. This system has been developed in the framework of the WEST project that equipped the existing Tore Supra device with a tungsten divertor in order to test actively cooled tungsten Plasma Facing Components (PFC) in view of preparing for ITER operation. The goal of this diagnostic is to measure the PFC sources and the deuterium recycling with spectral, spatial, and temporal resolution adapted to the predicted power deposition profiles on the objects observed.

View Article and Find Full Text PDF

The present work concerns the development of a W sources assessment system in the framework of the tungsten-W environment in steady state tokamak project that aims at equipping the existing Tore Supra device with a tungsten divertor in order to test actively cooled tungsten Plasma Facing Components (PFCs) in view of preparing ITER operation. The goal is to assess W sources and D recycling with spectral, spatial, and temporal resolution adapted to the PFCs observed. The originality of the system is that all optical elements are installed in the vacuum vessel and compatible with steady state operation.

View Article and Find Full Text PDF

An exploratory study was carried out in the long-pulse tokamak Tore Supra, to determine if electric fields in the plasma around high-power, RF wave launchers could be measured with non-intrusive, passive, optical emission spectroscopy. The focus was in particular on the use of the external electric field Stark effect. The feasibility was found to be strongly dependent on the spatial extent of the electric fields and overlap between regions of strong (>∼1 kV/cm) electric fields and regions of plasma particle recycling and plasma-induced, spectral line emission.

View Article and Find Full Text PDF

Fully dynamic Stark effect visible spectroscopy was used for the first time to directly measure the local rf electric field in the boundary plasma near a high-power antenna in high-performance, magnetically confined, fusion energy experiment. The measurement was performed in the superconducting tokamak Tore Supra, in the near field of a 1–3 MW, lower-hybrid, 3.7 GHz wave-launch antenna, and combined with modeling of neutral atom transport to estimate the local rf electric field amplitude (as low as 1–2 kV/cm) and direction in this region.

View Article and Find Full Text PDF

The Note reports on experimental studies of ripple born fast electrons within the TORE-SUPRA facility, which were performed by means of a modified measuring head equipped with diamond detectors designed especially for recording the electron-induced Cherenkov radiation. There are presented signals produced by fast electrons in the TORE-SUPRA machine, which were recorded during two experimental campaigns performed in 2010. Shapes of these electron-induced signals are considerably different from those observed during the first measurements carried out by the prototype Cherenkov probe in 2008.

View Article and Find Full Text PDF

The problem of light reflection has been raised as a high priority issue for optical diagnostics in next step fusion devices where metallic wall environment will generate significant perturbations in the diagnostics measurements. Tore Supra is a large size tokamak equipped with water-cooled stainless-steel panels used to sustain the plasma long shot radiations. These panels are highly reflective and affect significantly optical systems.

View Article and Find Full Text PDF

The paper presents a schematic design and tests of a system applicable for measurements of fast electron pulses emitted from high-temperature plasma generated inside magnetic confinement fusion machines, and particularly in the TORE-SUPRA facility. The diagnostic system based on the registration of the Cherenkov radiation induced by fast electrons within selected solid radiators is considered, and electron low-energy thresholds for different radiators are given. There are some estimates of high thermal loads, which might be deposited by intense electron beams upon parts of the diagnostic equipment within the TORE-SUPRA device.

View Article and Find Full Text PDF

Quasistationary operation has been achieved on the Joint European Torus tokamak in internal-transport-barrier (ITB) scenarios, with the discharge time limited only by plant constraints. Full current drive was obtained over all the high performance phase by using lower hybrid current drive. For the first time feedback control on the total pressure and on the electron temperature profile was implemented by using, respectively, the neutral beams and the ion-cyclotron waves.

View Article and Find Full Text PDF