The 1+/n+ method, based on an ECRIS charge breeder (CB) originally developed at the LPSC laboratory, is now implemented at GANIL for the production of Radioactive Ion Beams (RIBs). Prior to its installation in the middle of the low energy beam line of the SPIRAL1 facility, the 1+/n+ system CB has been modified based on the experiments performed on the CARIBU Facility at Argone National Laboratory. Later, it has been tested at the 1+/n+ LPSC test bench to validate its operation performances.
View Article and Find Full Text PDFIn the framework of the SPIRAL1 upgrade under progress at the GANIL lab, the charge breeder based on a LPSC Phoenix ECRIS, first tested at ISOLDE has been modified to benefit of the last enhancements of this device from the 1+/n+ community. The modifications mainly concern the 1 + optics, vacuum techniques, and the RF-buffer gas injection into the charge breeder. Prior to its installation in the midst of the low energy beam line of the SPIRAL1 facility, it has been decided to qualify its performances and several operation modes at the test bench of LPSC lab.
View Article and Find Full Text PDFRev Sci Instrum
February 2012
The SPIRAL 2 facility is now under construction and will deliver either stable or radioactive ion beams. First tests of nickel beam production have been performed at GANIL with a new version of the large capacity oven, and a calcium beam has been produced on the heavy ion low energy beam transport line of SPIRAL 2, installed at LPSC Grenoble. For the production of radioactive beams, several target∕ion-source systems (TISSs) are under development at GANIL as the 2.
View Article and Find Full Text PDFThe upgrade of the "Système de Production d'Ions Radioactifs en Ligne" phase I (SPIRAL I) installed at the "Grand Accélérateur National d'Ions Lourds" (GANIL) situated at Caen, France, is in progress and should be ready by 2014. In parallel, the first part of SPIRAL II facility is currently under construction. The global status of the upgrade is presented: goal, radioactive ion production systems, modification of the production cave and impact of the current safety re-evaluation of GANIL.
View Article and Find Full Text PDFDevelopment of new radioactive beams, and thus of new target ion sources (TISs) for isotope-separator-on-line production systems are in progress at GANIL for the SPIRAL 2 project. The efficiency and time response measurements of each step in the production process are crucial to predict and maximize the available yields, in particular, for short lived isotopes. This paper presents a method for measuring these quantities that makes use of a stable alkali chopped beam of controlled intensity.
View Article and Find Full Text PDF