Environ Sci Pollut Res Int
December 2021
Four subsurface flow constructed wetlands (SFCWs) filled with different substrates including ceramsite, ceramsite+pyrite, ceramsite+ferrous sulfide, and ceramsite+pyrite+ferrous sulfide (labeled as SFCW-S1, SFCW-S2, SFCW-S3, and SFCW-S4) were constructed, and the removal of nitrogen and phosphorus by these SFCWs coupled with intermittent aeration in the front section was discussed. The key findings from different substrate analyses, including nitrification and denitrification rate, enzyme activity, microbial community structure, and the X-ray diffraction, revealed the nitrogen and phosphorus removal mechanism. The results showed that the nitrogen and phosphorus removal efficiency for SFCW-S1 always remained the lowest, and the phosphorus removal efficiency for SFCW-S4 was recorded as the highest one.
View Article and Find Full Text PDF