Water Sci Technol
July 2024
Numerous countries and regions have embraced implementing a separate sewer system, segregating sanitary and storm sewers into distinct systems. However, the functionality of these systems often needs to improve due to irregular interconnections, resulting in a mixed and malfunctioning system. Sewage collection is crucial for residential sanitation, but untreated collection significantly contributes to environmental degradation.
View Article and Find Full Text PDFInspiratory muscle training represents a recommended clinical practice to improve physical performance of healthy individuals, athletes, and those with chronic diseases. This study aimed to evaluate whether high- and low-intensity inspiratory muscle training interferes with the aerobic capacity of indoor soccer players. Volunteers were equally and randomly divided into CON (control group, no inspiratory muscle training); HIG (high-intensity group, inspiratory muscle training at 80% of maximal inspiratory pressure, 3 sets of 12 repetitions); and LIG (low-intensity group, inspiratory muscle training at 50% of maximal inspiratory pressure, 2 sets of 20 repetitions).
View Article and Find Full Text PDFUnplanned urbanization is one of the main factors responsible for worsening flood-related problems in cities, increasing the frequency of flooding and flooding depths, consequently degrading both the natural and built environment. Considering this, the use of engineering techniques that reduce runoff and promote urban requalification are an efficient option for managing rainwater. This paper presents a case study of a flood control project using a storm water detention pond, designed to allow multiple uses of an urban space.
View Article and Find Full Text PDFThe city of Riohacha (Colombia) has a complex urban setting that, under the pressure of recurring intense rains, experiences increasing flood damage. With the aim of identifying a systemic solution to flood problems, a hydrodynamic mathematical modelling exercise was conducted. Within the modelling process, calibration and validation are two fundamental actions that must precede the use of the model.
View Article and Find Full Text PDF