Maintaining the reliability of the modern power system is becoming increasingly challenging due to the continuous growth in its size and complexity. One of the most significant challenges PS faces is frequency regulation, which is essential for maintaining a stable and reliable operation of PS. This article investigates the automatic generation control (AGC) of a multi-area PS considering partial loading scheduled in a hydro and thermal generating unit.
View Article and Find Full Text PDFPresent work focused on automatic generation control (AGC) of a three unequal area thermal systems considering reheat turbines and appropriate generation rate constraints (GRC). A fractional order (FO) controller named as I(λ)D(µ) controller based on crone approximation is proposed for the first time as an appropriate technique to solve the multi-area AGC problem in power systems. A recently developed metaheuristic algorithm known as firefly algorithm (FA) is used for the simultaneous optimization of the gains and other parameters such as order of integrator (λ) and differentiator (μ) of I(λ)D(µ) controller and governor speed regulation parameters (R).
View Article and Find Full Text PDF