Side-stream enhanced biological phosphorus removal process (S2EBPR) has been demonstrated to improve performance stability and offers a suite of advantages compared to conventional EBPR design. Design and optimization of S2EBPR require modification of the current EBPR models that were not able to fully reflect the metabolic functions of and competition between the polyphosphate-accumulating organisms (PAOs) and glycogen-accumulating organisms (GAOs) under extended anaerobic conditions as in the S2EBPR conditions. In this study, we proposed and validated an improved model (iEBPR) for simulating PAO and GAO competition that incorporated heterogeneity and versatility in PAO sequential polymer usage, staged maintenance-decay, and glycolysis-TCA pathway shifts.
View Article and Find Full Text PDFTo address the common challenges in enhanced biological phosphorus removal (EBPR) related to stability and unfavorable influent carbon to phosphorus ratio, a side-stream EBPR (S2EBPR) process that involves a side-stream anaerobic biological sludge hydrolysis and fermentation reactor was proposed as an emerging alternative. In this study, a full-scale pilot testing was performed with side-by-side operation of a conventional anaerobic-anoxic-aerobic (A2O) process versus a S2EBPR process. A comparison of the performance, activity and microbial community between the two configurations was performed.
View Article and Find Full Text PDFSidestream EBPR (S2EBPR) is an emerging alternative process to address common challenges in EBPR related to weak wastewater influent and may improve EBPR process stability. A systematic evaluation and comparison of the process performance and microbial community structure was conducted between conventional and S2EBPR facilities in North America. The statistical analysis suggested higher performance stability in S2EBPR than conventional EBPR, although possible bias associated with other plant-specific factors might have affected the comparison.
View Article and Find Full Text PDFEnhanced biological phosphorus removal (EBPR) was observed in high-rate, non-nitrifying plants in the United States that were operated in a plug-flow mode. In facilities designed for nitrification and denitrification, a first-stage anaerobic zone, free of nitrate and nitrite was needed to accomplish EBPR, and this is referred to as the Phoredox (a.k.
View Article and Find Full Text PDFWater Sci Technol
September 2008
The Stickney plant of the Metropolitan Wastewater Reclamation District of Greater Chicago (MWRDGC), one of the largest wastewater treatment plants in the world, treats an average dry weather flow of 22 m3/s and a sustained wet weather flow of 52 m3/s that can peak to 63 m3/s. Most of the inner city of Chicago has combined sewers, and in order to reduce pollution through combined sewer overflows (CSO), the 175 km Tunnel and Reservoir Plan (TARP) tunnels, up to 9.1 m in diameter, were constructed to receive and convey CSO to a reservoir from where it will be pumped to the Stickney treatment plant.
View Article and Find Full Text PDF