Bioresour Technol
March 2006
The removal of trivalent chromium from a combined tannery effluent in horizontal settling tanks and subsequent Advanced Integrated Wastewater Pond System (AIWPS) reactors was investigated. The raw combined effluent from Modjo tannery had pH in the range of 11.2-12.
View Article and Find Full Text PDFIn this study, a pilot-scale experiment was carried out on a pre-settled combined tannery effluent from Modjo tannery, Ethiopia, to evaluate the feasibility of the Advanced Integrated Wastewater Pond Systems or AIWPS Technology, for the treatment of tannery effluent. The pilot-scale AIWPS Facility was comprised of an Advanced Facultative Pond (AFP), Secondary Facultative Pond (SFP) and Maturation Pond (MP) all arranged in series. Three feed phases with low, moderate and overloading organic loading rates were applied to assess the organics and nutrients removal performances of the AIWPS reactors.
View Article and Find Full Text PDF