Rev Sci Instrum
March 2024
Currently, most buildings are constructed using prefabricated concrete slabs supported by a steel skeleton that is generally tied and welded manually. However, if the overall size of the skeleton is incorrect and this error is not noticed before the concrete is poured, then a huge waste is incurred by having to scrap all the prefabricated slabs. Therefore, we propose an automatic system for measuring the frame size needed for prefabricated slabs made of reinforced concrete using LabVIEW and the NI Vision library of machine-vision functions to perform image processing and machine-vision detection.
View Article and Find Full Text PDF