The wind tower block is welded with the flange to assemble the wind tower. The inherent strain due to local heating and cooling of the weld affects the flatness of the flange. Therefore, line heating is performed to satisfy the design criteria of the flange flatness, but the work variables depend on the operator's empirical judgment.
View Article and Find Full Text PDFIn the shipbuilding industry, welding is the main technique used to join steel structures. There is a lifting process, post-welding, that can eliminate the correction effect of line heating. Line heating is reperformed after the lifting process.
View Article and Find Full Text PDFGround-based pseudolite systems have some limitations, such as low vertical accuracy, multipath effects and near-far problems. These problems are not significant in airborne-based pseudolite systems. However, the monitoring of pseudolite positions is required because of the mobility of the platforms on which the pseudolites are mounted, and this causes performance degradation.
View Article and Find Full Text PDF