Water Sci Technol
November 2008
The Mediterranean seaside resort of Le Grau du Roi includes 40 hectares of landscaped areas spray irrigated with river water supplied through a separate network. Wastewater collected from several municipalities is treated in an activated sludge wastewater treatment plant (WWTP) and polished in waste stabilization ponds (WSPs). Planned substitution of treated wastewater for river water is hindered by spray irrigation prohibition within a 100 m distance from houses and recreational areas.
View Article and Find Full Text PDF