Improving the efficiency of waste-to-energy combined heat and power plants increases their production of both electricity and heat. Economic evaluation of such improvements enables adequate decisions to be made between the various alternatives with respect to economic viability of the plant. In this study, the cost and profitability of different modifications to improve efficiency in a waste-to-energy plant are considered: these include the re-arrangement of air heaters, the introduction of a reheater, flue gas condensation (FGC) and an integrated gasification-combustion process.
View Article and Find Full Text PDF