Current and future heavy-duty gas turbines (GTs) are being developed as an alternative or support to renewable energy sources (RESs). Therefore, GTs are subjected to several instances of being switched on and off; thus, the material fatigue limit can be reached in a short time. In such a scenario, possible out-of-tolerances (OoTs) in critical components must be considered.
View Article and Find Full Text PDF