The formation and evolution of aerobic granular sludge (AGS) developed in a sequential batch reactor (SBR) were evaluated to understand the effect of influential operating parameters on its morphology, stability, and removal performance while treating industrial/municipal wastewater. After 18 days of operation (stage I), mature granules were identified in the reactor, and in 25 days, the AGS system reached a stable operation. The chemical oxygen demand (COD) and total Kjeldahl nitrogen (TKN) were affected by the applied operating variations (from stages II to VII).
View Article and Find Full Text PDF