Background: A new method of scheduling anesthesia-controlled time (ACT) was implemented on July 1, 2012 in an academic inpatient operating room (OR) department. This study examined the relationship between this new scheduling method and OR performance. The new method comprised the development of predetermined time frames per anesthetic technique based on historical data of the actual time needed for anesthesia induction and emergence.
View Article and Find Full Text PDF